Loch Garman Offshore Wind

Background

Over the course of 2019 and 2020 ESB and Equinor undertook an extensive site selection process for the entire coast of Ireland to identify potentially suitable sites for developing offshore wind farms.

The process involved preliminary assessments of both environmental and technical aspects with consideration for the various stakeholders and marine users who could potentially be impacted by both site investigation works and the ultimate development of the wind farm.

Loch Garman Offshore Wind Farm


Loch Garman Offshore Wind Farm is one of ESB and Equinor’s proposed development projects. The site is located approximately 10km off the Co. Wexford coast. The ultimate site will be refined over time and it is anticipated that the final windfarm area is likely to be in the order of 120km2 which is approximately 45% of the overall turbine array study area (subject to detailed layout / energy analysis). The expected capacity output of the project will be approximately 600MW which is enough energy to power up to 600,000 homes based on the wind prevalence in the area.

Foreshore Licence Application

Map

In January 2021, ESB and Equinor submitted a Foreshore License application to the Department
of Housing, Local Government and Heritage.

The grant of a Foreshore license will convey the right to undertake preliminary survey work and
site investigation studies for what could be the location of the Loch Garman Offshore Wind Farm.

Such site investigation studies relate to the potential turbine array site, cable corridor and cable landfall areas, respectively. The results of the proposed survey work, in conjunction with other desktop studies will assist in determining the feasibility of developing an offshore wind farm at this location.

The survey work will be used to inform the optimal area for the wind farm within the study site and will also provide baseline data for the Environmental Impact Assessment (EIA) Process. Should the site be deemed suitable for an offshore windfarm, ESB and Equinor aim to seek planning permission for the project at the appropriate time under the terms of the Marine Planning and Development Management Bill which is due to be enacted in 2021.

A link to the Department of Housing, Local Government and Heritage application webpage for this project will be posted on this page as soon as it is available.

The application documents submitted to the Department will also be posted on this page when the application is formally accepted by the Department.